Rio Tinto Alcan, Yarwun.
Rio Tinto Alcan, Yarwun. Tom Huntley

Rio Tinto Alcan’s production up thanks to Yarwun demand

RIO Tinto Alcan has boosted bauxite production by 21% in the second quarter of the year, compared to the same quarter in 2012.

Strong operational performance has driven higher volumes at Weipa, as bauxite requirements from the expanded Yarwun refinery at Gladstone increased, along with third party demand.

Meanwhile, Rio's alumina production was 7% higher in the same period, with greater refining capacity at Yarwun.

Aluminium production was up 15%.

In 2013, Rio Tinto Alcan's share of bauxite, alumina and aluminium production is expected to be 34 million tonnes, 7.3 million tonnes and 2.5 million tonnes, respectively.



Gladstone mum jailed for $100K Centrelink fraud

premium_icon Gladstone mum jailed for $100K Centrelink fraud

Mum jailed for $100K Centrelink fraud

PopCon returning soon

premium_icon PopCon returning soon

GLADSTONE’S number one cosplaying event is set to make a smash return for the third...

IN COURT: 53 people set to appear in Gladstone

premium_icon IN COURT: 53 people set to appear in Gladstone

EACH day, a number of people appear in Gladstone court on a range of different...